Interconnection Queues

Interconnection Queues#

All ISOs support retrieving interconnection queues with iso.get_interconnection_queue methods.

Each of the ISOs report slightly differently fields for their queues, so a best effort was made to standardize column names. When a column couldn’t be standardized, it is appended to end of the returned dataframe.

Below you can see preview of each of ISOs interconnection queues

NYISO#

import gridstatus
nyiso = gridstatus.NYISO()
nyiso.get_interconnection_queue()
/home/docs/checkouts/readthedocs.org/user_builds/isodata/checkouts/v0.28.0/gridstatus/nyiso.py:529: UserWarning: Could not infer format, so each element will be parsed individually, falling back to `dateutil`. To ensure parsing is consistent and as-expected, please specify a format.
  queue["Proposed COD"] = pd.to_datetime(
/home/docs/checkouts/readthedocs.org/user_builds/isodata/checkouts/v0.28.0/gridstatus/nyiso.py:533: UserWarning: Could not infer format, so each element will be parsed individually, falling back to `dateutil`. To ensure parsing is consistent and as-expected, please specify a format.
  queue["Proposed In-Service Date"] = pd.to_datetime(
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Withdrawn Date Withdrawal Comment Actual Completion Date Proposed In-Service Date Proposed Initial-Sync Date Last Updated Date Z S Availability of Studies SGIA Tender Date
0 0276 Homer Solar Energy Center Homer Solar Energy Center LLC Cortland NY Cortland - Fenner 115kV NM-NG Solar 90.0 90.0 ... NaN NaN NaT NaT NaT 2023-07-31 C 11.0 FES, SRIS, FS NaN
1 0396A Wood Street Transformer New York State Electric & Gas Putnam NY Wood St. 345/115kV NYSEG AC Transmission 0.0 NaN ... NaN NaN NaT NaT NaT 2024-05-31 G 12.0 SIS NaN
2 0429 North Rockland Station Orange & Rockland Steuben NY Line Y88 345kV ConEd AC Transmission 0.0 NaN ... NaN NaN NaT NaT NaT 2022-03-31 G 12.0 SIS NaN
3 0430 Cedar Rapids Transmission H.Q. Energy Services U.S. Inc. St. Lawrence NY Dennison - Alcoa 115kV NM-NG AC Transmission 0.0 NaN ... NaN NaN NaT NaT NaT 2019-12-31 D 12.0 SIS, FS NaN
4 0495 Mohawk Solar Mohawk Solar LLC Montgomery NY St. Johnsville - Marshville 115kV NM-NG Solar 90.5 90.5 ... NaN NaN NaT NaT NaT 2022-09-30 F 11.0 FES, SRIS, FS NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1727 0768 Janis Solar Janis Solar, LLC Cortland NY Willet 34.5kV NYSEG Solar 20.0 20.0 ... NaN NaN 2022-11-30 NaT NaT 2022-11-30 C 14.0 FES, SIS, FS None
1728 0769 North County Energy Storage NY Power Authority Franklin NY Willis 115kV NYPA Energy Storage 20.0 20.0 ... NaN NaN 2023-09-30 NaT NaT 2023-09-30 D 14.0 SIS None
1729 0775 Puckett Solar Puckett Solar, LLC Chenango NY Chenango Forks 34.5kV NYSEG Solar 20.0 20.0 ... NaN NaN 2022-09-30 NaT NaT 2022-09-30 C 14.0 SIS, FS None
1730 0781 Marcy South SSR Detection NY Power Authority Delaware NY Fraser - Annex 345 kV Substation NYPA AC Transmission 0.0 NaN ... NaN NaN 2019-09-30 NaT NaT 2019-09-30 E 14.0 SIS, FS None
1731 0849 Somerset Load Somerset Operating Company, LLC Niagara NY Kintigh 345kV NYSEG Load 250.0 250.0 ... NaN NaN 2022-07-31 NaT NaT 2022-07-31 A 14.0 SIS, FS None

1732 rows × 24 columns

CAISO#

caiso = gridstatus.CAISO()
caiso.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Interconnection Request Receive Date Interconnection Agreement Status Study Process Proposed On-line Date (as filed with IR) System Impact Study or Phase I Cluster Study Facilities Study (FAS) or Phase II Cluster Study Optional Study (OS) Full Capacity, Partial or Energy Only (FC/P/EO) Off-Peak Deliverability and Economic Only Feasibility Study or Supplemental Review
0 22 MONTEZUMA (HIGH WINDS III) None SOLANO CA Birds Landing 230 kV PGAE Wind Turbine + Storage 38.00 None ... 2003-11-18 00:00:00 Executed AMEND 39 2005-06-30 07:00:00 Complete Complete NaN Partial Capacity Off-Peak Deliverability NaN
1 32 TULE WIND None SAN DIEGO CA Boulevard East Substation 138 kV SDGE Wind Turbine 193.80 None ... 2004-05-12 00:00:00 Executed Serial LGIP 2007-09-01 07:00:00 Complete Complete NaN Partial Capacity Off-Peak Deliverability Waived
2 61 FRESNO COGENERATION EXPANSION PROJECT None FRESNO CA Helm-Kerman 70 kV Line PGAE Steam Turbine + Storage 73.27 None ... 2005-03-28 00:00:00 Executed AMEND 39 2006-05-31 07:00:00 Complete Complete NaN Full Capacity Off-Peak Deliverability NaN
3 72 LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT None RIVERSIDE CA Proposed Lee Lake Substation 500 kV SDGE Storage 500.00 None ... 2005-04-26 00:00:00 Executed Serial LGIP 2008-12-31 08:00:00 Complete Re-Study NaN Full Capacity NaN Waived
4 81 BOTTLE ROCK POWER None LAKE CA Geysers #17-Fulton 230 kV Line PGAE Steam Turbine + Storage 52.01 None ... 2005-09-13 00:00:00 Executed Serial LGIP 2006-09-01 07:00:00 Complete Complete NaN Energy Only Off-Peak Deliverability NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
2274 2191 FREIGHT ENERGY STORAGE None SAN DIEGO CA Border Substation 69 kV SDGE Storage 50.00 None ... 2021-04-15 00:00:00 NaN C14 2025-06-01 07:00:00 NaN NaN NaN Full Capacity NaN NaN
2275 2193 VENTANA ENERGY STORAGE None SAN BERNARDINO CA Lugo SCE Storage 250.00 None ... 2021-11-19 00:00:00 NaN ISP 2024-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN
2276 2194 PRONGHORN ENERGY STORAGE None LOS ANGELES CA Antelope SCE Storage 120.00 None ... 2022-05-07 00:00:00 NaN ISP 2026-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN
2277 2197 VENTANA RELIABILITY PROJECT None SAN BERNARDINO CA Lugo SCE Storage 250.00 None ... 2022-09-29 00:00:00 NaN ISP 2024-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN
2278 2198 VISTA RELIABILITY None LOS ANGELES CA Vincent SCE Storage 250.00 None ... 2022-10-14 00:00:00 NaN ISP 2024-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN

2279 rows × 36 columns

SPP#

spp = gridstatus.SPP()
spp.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Withdrawal Comment Actual Completion Date In-Service Date Commercial Operation Date Cessation Date Current Cluster Cluster Group Replacement Generator Commercial Op Date Service Type Status (Original)
0 GEN-2024-SR9 None None Beaver County OK Beaver County Substation 345 kV OG&E Battery/Storage 150.0 150.0 ... None None NaN 1/1/2027 NaN Surplus 04 SOUTHEAST NaN ER NaN
1 GEN-2024-SR8 None None Greely County NE Spalding to North Loup 115kV NPPD Battery/Storage 70.0 70.0 ... None None NaN 12/31/2026 NaN Surplus 02 NEBRASKA NaN ER NaN
2 GEN-2024-SR7 None None Beaver County OK Beaver County Substation 345 kV OG&E Solar 200.0 200.0 ... None None NaN 6/1/2027 NaN Surplus 04 SOUTHEAST NaN ER NaN
3 GEN-2024-SR6 None None Johnston County OK Interconnecting at Hugo - Sunnyside 345 kV tra... OG&E Battery/Storage 200.0 200.0 ... None None NaN NaN NaN Surplus 04 SOUTHEAST NaN ER NaN
4 GEN-2024-SR5 None None Drumright OK 138 kV Greenwood Station OG&E Battery/Storage 176.9 176.9 ... None None NaN 6/1/2025 NaN Surplus 04 SOUTHEAST NaN ER NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
2360 GEN-2000-005 None None Lake Thunderbird OK NaN OGE Thermal - Gas 825.0 0.0 ... None None NaN NaN NaN NaN NaN NaN ER WITHDRAWN
2361 GEN-2000-004 None None Valliant OK NaN AEP Thermal - Gas 800.0 0.0 ... None None NaN NaN NaN NaN NaN NaN ER WITHDRAWN
2362 GEN-2000-003 None None Moore County TX NaN SPS Thermal - Gas 280.0 0.0 ... None None NaN NaN NaN NaN NaN NaN ER WITHDRAWN
2363 GEN-2000-001 None None Newport NaN NaN NaN Thermal - Gas 100.0 0.0 ... None None NaN NaN NaN NaN NaN NaN ER WITHDRAWN
2364 GEN-1999-099 None None NaN NaN NaN NaN 0.0 0.0 ... None None NaN NaN NaN NaN NaN NaN NaN WITHDRAWN

2365 rows × 25 columns

Ercot#

ercot = gridstatus.Ercot()
ercot.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... IA Signed Air Permit GHG Permit Water Availability Meets Planning Meets All Planning CDR Reporting Zone Approved for Energization Approved for Synchronization Comment
0 15INR0064b Harald (BearKat Wind B) CIP Glasscock Texas 59903 Bearkat 345kV None Wind - Wind Turbine 162.10 None ... 2018-05-30 Not Required Not Required Not Required 2018-05-30 00:00:00 2018-09-19 00:00:00 WEST 2020-02-10 2020-05-12 NaN
1 16INR0049 Nazareth Solar TX Nazareth Solar, LLC Castro Texas tap 345kV 23914 Tule Canyon - 23912 Ogallala C2 None Solar - Photovoltaic Solar 204.00 None ... 2023-06-07 Not Required Not Required Not Required 2024-03-22 00:00:00 NaN PANHANDLE NaT NaT NaN
2 16INR0081 Mesteno Wind Mesteno Windpower, LLC Starr Texas 80355 Del Sol 345kV None Wind - Wind Turbine 201.60 None ... 2018-04-25 Not Required Not Required Not Required 2018-04-25 00:00:00 2019-03-28 00:00:00 SOUTH 2019-11-26 2019-12-12 NaN
3 16INR0085 Priddy Wind ENGIE North America Mills Texas tap 345kV 1444 Brown – 3422 Killeen None Wind - Wind Turbine 302.40 None ... 2020-08-13 Not Required Not Required Not Required 2021-03-29 00:00:00 2021-04-30 00:00:00 NORTH 2021-10-13 2021-11-19 NaN
4 16INR0104 Big Sampson Wind Big Sampson Wind Project, LLC Crockett Texas tap 345kV 76015 Cedar Canyon - 7053 Noelke None Wind - Wind Turbine 265.40 None ... 2019-11-08 Not Required Not Required Not Required NaN NaN WEST NaT NaT NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1638 29INR0046 Veco Ranch BESS SLF Orion US Land Holding Co LLC Webb Texas 8283 ASHERTON4A 138kV\n None Other - Battery Energy Storage 78.50 None ... NaT NaN NaN Not Required NaN NaN SOUTH NaT NaT NaN
1639 29INR0048 Rippling Curve Peaking Power OxyVinyls LP Harris Texas 41580 TIDAL__X06B8 138kV\n None Gas - Combustion (gas) Turbine, but not part o... 208.00 None ... NaT NaN NaN NaN NaN NaN HOUSTON NaT NaT NaN
1640 30INR0002 Southeast Oklahoma Pumped Storage Apex Energy Solutions, LLC Lamar Texas 1692 Paris Switch 345kV None Other - Energy Storage 1232.00 None ... NaT NaN NaN NaN NaN NaN NORTH NaT NaT NaN
1641 30INR0004 Hecate Energy Arkansas Wind Hecate Energy Gulf Wind LLC San Patricio Texas 8659 Naismith 345kV None Wind - Wind Turbine 1029.39 None ... NaT NaN NaN Not Required NaN NaN COASTAL NaT NaT NaN
1642 30INR0005 Woodland Energy Storage Woodland Energy Storage, LLC Bosque Texas 68040 Kopperl Substation 345kV None Other - Battery Energy Storage 207.60 None ... NaT NaN NaN Not Required NaN NaN NORTH NaT NaT NaN

1643 rows × 35 columns

MISO#

miso = gridstatus.MISO()
miso.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... giaToExec studyCycle studyGroup studyPhase svcType dp1ErisMw dp1NrisMw dp2ErisMw dp2NrisMw sisPhase1
0 J3464 None None Story IA Fernald ITC MIDWEST Solar 200.0 200.0 ... NaN DPP-2023 West 0.0 0.0 0.0 0.0
1 J3462 None None Tama IA Dysart - Traer 161kV ITC MIDWEST Solar 187.0 187.0 ... NaN DPP-2023 West 0.0 0.0 0.0 0.0
2 J3461 None None Muscatine IA SUB 56 - SUB 89 161.0kV MIDAMERICAN ENERGY CO. Solar 156.0 156.0 ... NaN DPP-2023 West 0.0 0.0 0.0 0.0
3 J3463 None None Jefferson MS LORMAN SS (CE) - FAYETTE 115.0kV ENTERGY MISSISSIPPI, LLC. Solar 100.0 100.0 ... NaN DPP-2023 South 0.0 0.0 0.0 0.0
4 J3485 None None Wayne MI JEFFERSON ITC Battery Storage 100.0 100.0 ... NaN DPP-2023 East (ITC) 0.0 0.0 0.0 0.0
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
3214 J3743 None None Tuscola MI ARROWHEAD ITC Wind 175.5 175.5 ... NaN DPP-2023 East (ITC) 0.0 0.0 0.0 0.0
3215 R1051 None None Scott County MN Blue Lake 115kV 55.0 55.0 ... NaN Network Resource Interconnection Service (NRIS) 0.0 0.0 0.0 0.0
3216 J544 None None 0.0 0.0 ... 2018-01-12T05:00:00+00:00 98.1 98.1 98.1 98.1
3217 S1045 None None 0.0 0.0 ... NaN 0.0 0.0 0.0 0.0
3218 J446 None None 0.0 0.0 ... NaN 0.0 0.0 0.0 0.0

3219 rows × 31 columns

ISONE#

isone = gridstatus.ISONE()
isone.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... I39 Dev Zone System Impact Study Completed Feasiblity Study Status System Impact Study Status Optional Interconnection Study Status Facilities Study Status Interconnection Agreement Status Project Status
0 1592 SHELD BESS None Hampden MA South Hadley Electric Light Department 13.8KV NaN BAT 3.000 3.000 ... N PD WMA N NaN NaN NaN NaN NaN NaN
1 1591 Chase Hill Substation - Western RI DER Study #3 None Washington RI RIE Feeder 155F2, Chase Hill Substation NaN SUN 2.375 2.375 ... N PD RI N NaN NaN NaN NaN NaN NaN
2 1590 Tower Hill Substation - Western RI DER Study #3 None Washington RI RIE Feeder 88F7, Tower Hill Substation NaN SUN 3.060 3.060 ... N PD RI N NaN NaN NaN NaN NaN NaN
3 1589 Kent County Substation - Western RI DER Study #3 None Kent RI RIE feeder 3309 and 3311, Kent County Substation NaN SUN 21.748 21.748 ... N PD RI N NaN NaN NaN NaN NaN NaN
4 1588 Wood River Substation - Western RI DER Study #3 None Washington RI RIE feeder 85T2 and 85T3, Wood River Substation NaN SUN 49.000 49.000 ... N PD RI N NaN NaN NaN NaN NaN NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1737 5 Brayton Pt None Bristol MA Brayton Point 345 kV Station NGRID NaN NaN NaN ... Y NaN RI Y NaN NaN NaN NaN NaN NaN
1738 4 EMI Dighton Power Project None Bristol MA U6 Line NGRID NG NaN NaN ... Y NaN SEMA Y NaN NaN NaN NaN NaN NaN
1739 3 Androscoggin Energy Center None Franklin ME Jay 115 kV Substation CMP DFO NG NaN NaN ... Y NaN ME Y NaN NaN NaN NaN NaN NaN
1740 2 EMI-Tiverton None Newport RI Near Tiverton 115 kV Substation NGRID NG NaN NaN ... Y NaN SEMA Y NaN NaN NaN NaN NaN NaN
1741 1 Millennium+K117 None Worcester MA W 123 Line NGRID DFO NG NaN NaN ... Y NaN WMA Y NaN NaN NaN NaN NaN NaN

1742 rows × 32 columns

PJM#

pjm = gridstatus.PJM()
pjm.get_interconnection_queue()
---------------------------------------------------------------------------
ValueError                                Traceback (most recent call last)
Cell In[7], line 1
----> 1 pjm = gridstatus.PJM()
      2 pjm.get_interconnection_queue()

File ~/checkouts/readthedocs.org/user_builds/isodata/checkouts/v0.28.0/gridstatus/pjm.py:451, in PJM.__init__(self, api_key, retries)
    448 self.api_key = api_key or os.getenv("PJM_API_KEY")
    450 if not self.api_key:
--> 451     raise ValueError("api_key must be provided or set in PJM_API_KEY env var")

ValueError: api_key must be provided or set in PJM_API_KEY env var