Interconnection Queues#

All ISOs support retrieving interconnection queues with iso.get_interconnection_queue methods.

Each of the ISOs report slightly differently fields for their queues, so a best effort was made to standardize column names. When a column couldn’t be standardized, it is appended to end of the returned dataframe.

Below you can see preview of each of ISOs interconnection queues

NYISO#

import gridstatus
nyiso = gridstatus.NYISO()
nyiso.get_interconnection_queue()
/home/docs/checkouts/readthedocs.org/user_builds/isodata/envs/0.21.0/lib/python3.10/site-packages/gridstatus/nyiso.py:367: UserWarning: Could not infer format, so each element will be parsed individually, falling back to `dateutil`. To ensure parsing is consistent and as-expected, please specify a format.
  queue["Proposed COD"] = pd.to_datetime(
/home/docs/checkouts/readthedocs.org/user_builds/isodata/envs/0.21.0/lib/python3.10/site-packages/gridstatus/nyiso.py:375: UserWarning: Could not infer format, so each element will be parsed individually, falling back to `dateutil`. To ensure parsing is consistent and as-expected, please specify a format.
  queue["Proposed Initial-Sync Date"] = pd.to_datetime(
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Withdrawn Date Withdrawal Comment Actual Completion Date Proposed In-Service Proposed Initial-Sync Date Last Updated Date Z S Availability of Studies SGIA Tender Date
0 0276 Homer Solar Energy Center NaN Cortland NY NaN NM-NG Solar 90.0 90.0 ... NaN NaN NaN NaT 2023-09-01 9/30/2022 C 10.0 FES, SRIS, FS NaN
1 0396A Wood Street Transformer NaN Putnam NY NaN NYSEG AC Transmission 0.0 NaN ... NaN NaN NaN NaT NaT 4/30/2021 G 12.0 SIS NaN
2 0429 North Rockland Station NaN Steuben NY NaN ConEd AC Transmission 0.0 NaN ... NaN NaN NaN NaT NaT 3/31/2022 G 12.0 SIS NaN
3 0430 Cedar Rapids Transmission NaN St. Lawrence NY NaN NM-NG AC Transmission 0.0 NaN ... NaN NaN NaN NaT NaT 12/31/2019 D 12.0 SIS, FS 10/2/2018
4 0495 Mohawk Solar NaN Montgomery NY NaN NM-NG Solar 90.5 90.5 ... NaN NaN NaN NaT 2024-09-01 9/30/2022 F 11.0 FES, SRIS, FS NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1554 0748 Regan Solar NaN Montgomery NY NaN NM-NG Solar 20.0 20.0 ... NaN NaN 2023-04-30 00:00:00 NaT NaT 2023-04-30 00:00:00 F 14 SIS, FS None
1555 0768 Janis Solar NaN Cortland NY NaN NYSEG Solar 20.0 20.0 ... NaN NaN 2023-04-30 00:00:00 NaT NaT 2023-04-30 00:00:00 C 14 SIS, FS None
1556 0775 Puckett Solar NaN Chenango NY NaN NYSEG Solar 20.0 20.0 ... NaN NaN 2023-04-30 00:00:00 NaT NaT 2023-04-30 00:00:00 C 14 SIS, FS None
1557 0781 Marcy South SSR Detection NaN Delaware NY NaN NYPA AC Transmission 0.0 NaN ... NaN NaN 2020-04-30 00:00:00 NaT NaT 2020-04-30 00:00:00 E 14 SIS None
1558 0849 Somerset Load NaN Niagara NY NaN NYSEG Load 250.0 250.0 ... NaN NaN 2023-04-30 00:00:00 NaT NaT 2023-04-30 00:00:00 A 14 SIS None

1559 rows × 24 columns

CAISO#

caiso = gridstatus.CAISO()
caiso.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Interconnection Request Receive Date Interconnection Agreement Status Study Process Proposed On-line Date (as filed with IR) System Impact Study or Phase I Cluster Study Facilities Study (FAS) or Phase II Cluster Study Optional Study (OS) Full Capacity, Partial or Energy Only (FC/P/EO) Off-Peak Deliverability and Economic Only Feasibility Study or Supplemental Review
0 22 MONTEZUMA (HIGH WINDS III) None SOLANO CA Birds Landing Sub 230 kV Bus PGAE Wind Turbine + Storage 38.00 None ... 2003-11-18 00:00:00 Executed AMEND 39 2005-06-30 07:00:00 Valid Valid NaN NaN Off-Peak Deliverability NaN
1 32 TULE WIND None SAN DIEGO CA Boulevard East Substation 138 kV SDGE Wind Turbine 193.80 None ... 2004-05-12 00:00:00 Executed Serial LGIP 2007-09-01 07:00:00 Valid Valid NaN Partial Capacity Off-Peak Deliverability Waived
2 61 FRESNO COGENERATION EXPANSION PROJECT None FRESNO CA Helm-Kerman 70kV line PGAE Steam Turbine + Storage 73.27 None ... 2005-03-28 00:00:00 Executed AMEND 39 2006-05-31 07:00:00 Valid Valid NaN NaN Off-Peak Deliverability NaN
3 72 LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT None RIVERSIDE CA Proposed Lee Lake Substation 500 kV SDGE Storage 500.00 None ... 2005-04-26 00:00:00 Executed Serial LGIP 2008-12-31 08:00:00 Valid Re-Study NaN Full Capacity NaN Waived
4 138 SANDSTORM WIND POWER None RIVERSIDE CA Devers - San Bernardino 230 kV line SCE Wind Turbine + Storage 150.00 None ... 2006-10-23 00:00:00 Executed Serial LGIP 2008-12-31 08:00:00 Valid Valid NaN Partial Capacity Off-Peak Deliverability Waived
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
2274 2189 LA FUENTE ENERGY STORAGE None SAN DIEGO CA Otay Mesa Switchyard 230 kV SDGE Storage 100.00 None ... 2021-04-14 00:00:00 NaN C14 2024-06-01 07:00:00 NaN NaN NaN Full Capacity NaN NaN
2275 2190 HERMES ENERGY STORAGE None SAN DIEGO CA Border Substation 69 kV SDGE Storage 150.00 None ... 2021-04-15 00:00:00 NaN C14 2024-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN
2276 2191 FREIGHT ENERGY STORAGE None SAN DIEGO CA Border Substation 69 kV SDGE Storage 50.00 None ... 2021-04-15 00:00:00 NaN C14 2025-06-01 07:00:00 NaN NaN NaN Full Capacity NaN NaN
2277 2193 VENTANA ENERGY STORAGE None SAN BERNARDINO CA Lugo SCE Storage 250.00 None ... 2021-11-19 00:00:00 NaN ISP 2024-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN
2278 2194 PRONGHORN ENERGY STORAGE None LOS ANGELES CA Antelope SCE Storage 120.00 None ... 2022-05-07 00:00:00 NaN ISP 2026-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN

2279 rows × 36 columns

SPP#

spp = gridstatus.SPP()
spp.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Withdrawn Date Withdrawal Comment Actual Completion Date In-Service Date Commercial Operation Date Cessation Date Current Cluster Cluster Group Replacement Generator Commercial Op Date Service Type
0 GEN-2023-SR9 None None Lorenzo TX Tap Floyd County Interchange and Crosby County... Xcel Battery/Storage 50.00 50.00 ... None None None NaN 6/1/2025 NaN Surplus NaN NaN ER
1 GEN-2023-SR8 None None Gruver TX Hitchland 345 kV Substation Xcel Battery/Storage 200.00 200.00 ... None None None NaN 6/1/2025 NaN Surplus NaN NaN ER
2 GEN-2023-SR7 None None NaN NaN Hoskins 345 kV Substation NaN Battery/Storage 135.00 135.00 ... None None None NaN 12/31/2024 NaN Surplus NaN NaN ER
3 GEN-2023-SR6 None None NaN NaN Hoskins 345 kV Substation NaN Solar 100.24 100.24 ... None None None NaN 12/31/2024 NaN Surplus NaN NaN ER
4 GEN-2023-SR5 None None Seiling OK Tatonga 345 kV Substation NaN Battery/Storage 85.00 85.00 ... None None None NaN 12/31/2024 NaN Surplus NaN NaN ER
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
930 GEN-2001-029N None None Beatrice NE NaN NPPD Thermal - Gas 250.00 250.00 ... None None None 1/1/2005 1/1/2005 NaN NaN NaN NaN ER
931 GEN-2001-026 None None Meers OK Washita 138kV WFEC Wind 74.25 74.25 ... None None None 10/1/2003 10/1/2003 NaN ICS-2008-001 Prior Queued 04 SOUTHEAST NaN ER
932 GEN-2001-024 None None Washington County AR SWEPCO Tontitown 161kV Substation AEP Thermal - CT 630.00 580.00 ... None None None 5/1/2007 7/1/2007 NaN NaN NaN NaN ER
933 GEN-2001-018 None None Neosho County KS Chanute NW Neosho Cnty By Tioga Sub WERE Thermal - Gas 47.00 47.00 ... None None None 1/1/2002 1/1/2002 NaN NaN NaN NaN ER
934 GEN-2001-014 None None Sleeping Bear OK Ft Supply 138kV WFEC Wind 94.50 94.50 ... None None None 6/30/2007 4/15/2007 NaN ICS-2008-001 Prior Queued 04 SOUTHEAST NaN ER

935 rows × 24 columns

Ercot#

ercot = gridstatus.Ercot()
ercot.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... IA Signed Air Permit GHG Permit Water Availability Meets Planning Meets All Planning CDR Reporting Zone Approved for Energization Approved for Synchronization Comment
0 14INR0033 Goodnight Wind FGE Goodnight I, LLC Armstrong Texas tap 345kV 79500 Alibates - 79503 Tule Canyon CKT2 None Wind - Wind Turbine 258.10 None ... 2019-08-18 Not Required Not Required Not Required NaN NaN PANHANDLE NaT NaT NaN
1 15INR0064b Harald (BearKat Wind B) CIP Glasscock Texas 59903 Bearkat 345kV None Wind - Wind Turbine 162.10 None ... 2018-05-30 Not Required Not Required Not Required 2018-05-30 00:00:00 2018-09-19 00:00:00 WEST 2020-02-10 2020-05-12 NaN
2 16INR0049 Nazareth Solar TX Nazareth Solar, LLC Castro Texas tap 345kV 23914 Tule Canyon - 23912 Ogallala C2 None Solar - Photovoltaic Solar 204.00 None ... 2018-05-10 Not Required Not Required Not Required NaN NaN PANHANDLE NaT NaT NaN
3 16INR0081 Mesteno Wind Mesteno Windpower, LLC Starr Texas 80355 Del Sol 345kV None Wind - Wind Turbine 201.60 None ... 2018-04-25 Not Required Not Required Not Required 2018-04-25 00:00:00 2019-03-28 00:00:00 SOUTH 2019-11-26 2019-12-12 NaN
4 16INR0085 Priddy Wind ENGIE North America Mills Texas tap 345kV 1444 Brown – 3422 Killeen None Wind - Wind Turbine 302.40 None ... 2020-08-13 Not Required Not Required Not Required 2021-03-29 00:00:00 2021-04-30 00:00:00 NORTH 2021-10-13 2021-11-19 NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1225 27INR0035 Delta Lake Irrigation District 1 Solar Mestenas Floating Solar LLC Hidalgo Texas Tap 345 kV 8383 North Edinburg - 8059 Mantle None Solar - Photovoltaic Solar 186.96 None ... NaT NaN NaN Not Required NaN NaN SOUTH NaT NaT NaN
1226 27INR0036 La Feria Irrigation District 1 Solar La Patrona Floating Solar LLC Cameron Texas tap the 138 kV Wesmer (#8347) – Mesquite (#855... None Solar - Photovoltaic Solar 54.35 None ... NaT NaN NaN Not Required NaN NaN COASTAL NaT NaT NaN
1227 27INR0038 SCOTT CROSSING STORAGE SLF FRESH AIR ENERGY II, LLC Haskell Texas Bus # 6161 Paint Creek substation 138kV 0.5 mi... None Other - Battery Energy Storage 0.00 None ... NaT NaN NaN Not Required NaN NaN WEST NaT NaT NaN
1228 27INR0039 Live Oak Bayou Storage SLF FRESH AIR ENERGY II, LLC Matagorda Texas Tap 345Kv 5915 South Texas - 47531 Jones Creek... None Other - Battery Energy Storage 0.00 None ... NaT NaN NaN Not Required NaN NaN COASTAL NaT NaT NaN
1229 30INR0002 Southeast Oklahoma Pumped Storage Apex Energy Solutions, LLC Lamar Texas 1692 Paris Switch 345kV None Other - Energy Storage 1232.00 None ... NaT NaN NaN NaN NaN NaN NORTH NaT NaT NaN

1230 rows × 35 columns

MISO#

miso = gridstatus.MISO()
miso.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... giaToExec studyCycle studyGroup studyPhase svcType dp1ErisMw dp1NrisMw dp2ErisMw dp2NrisMw sisPhase1
0 E002 None None Pointe Coupee LA 500 kV switchyard at Big Cajon II Entergy Gas 15.0 15.0 ... 2013-12-16T05:00:00Z ERIS 0.0 0.0 0.0 0.0
1 E291 None None TX Rich 138 kV substation Entergy Hydro 27.0 27.0 ... 2013-10-22T04:00:00Z ERIS 0.0 0.0 0.0 0.0
2 G001 None None Brown County WI Unknown American Transmission Co. LLC 255.0 255.0 ... None SPA - SIS ERIS 0.0 0.0 0.0 0.0
3 G002 None None Trimble County KY Unknown LG&E and KU Services Company as agent for Loui... Coal 174.0 174.0 ... None ERIS 0.0 0.0 0.0 0.0
4 G003 None None Trimble County KY Unknown LG&E and KU Services Company as agent for Loui... Coal 174.0 174.0 ... None ERIS 0.0 0.0 0.0 0.0
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
4248 R62 None None Greene County IA Grimes - Lehigh 345 kV MidAmerican Energy Company Wind 300.0 300.0 ... None SPA-2014-NOV West SPA - SIS NRIS 0.0 0.0 0.0 0.0
4249 R63 None None Calhoun County IA Raun - Lehigh 345 kV MidAmerican Energy Company Wind 300.0 300.0 ... None SPA - SIS NRIS 0.0 0.0 0.0 0.0
4250 R64 None None Carroll County IA Victory Substation MidAmerican Energy Company Wind 70.0 70.0 ... None Feasibility NRIS 0.0 0.0 0.0 0.0
4251 R65 None None Cass County IA R34 Expansion MidAmerican Energy Company Wind 92.0 92.0 ... None DPP-2012-AUG WEST Network Upgrade NRIS 0.0 0.0 0.0 0.0
4252 R66 None None Adams County IA Creston - Clarinda 161 kV MidAmerican Energy Company Wind 150.0 150.0 ... None Feasibility NRIS 0.0 0.0 0.0 0.0

4253 rows × 31 columns

ISONE#

isone = gridstatus.ISONE()
isone.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Serv I39 Dev Zone FS SIS OS FAC IA Project Status
0 1400 Battery Storage None Hartford CT 41.6317, -72.7289, Berlin 115 kV Substation NaN BAT 101.970 101.970 ... CNR N PD CT NaN N NaN NaN NaN NaN
1 1399 Battery Storage None Hampden MA The proposed POI is Buck Pond 115 kV substatio... NaN BAT 92.438 92.438 ... CNR N PD WMA NaN N NaN NaN NaN NaN
2 1398 Battery Storage None Worcester MA 42.61536944, -71.93045000, Ashburnham 115 kV S... NaN BAT 101.970 101.970 ... CNR N PD CMA NaN N NaN NaN NaN NaN
3 1397 Battery Storage None Worcester MA 42.31815556, -71.98500556, Treasure Valley 115... NaN BAT 101.970 101.970 ... CNR N PD CMA NaN N NaN NaN NaN NaN
4 1396 Battery Storage None Providence RI 41.82919444, -71.52111667, Hartford 115 kV Sub... NaN BAT 101.970 101.970 ... CNR N PD RI NaN N NaN NaN NaN NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1545 5 Brayton Pt None Bristol MA Brayton Point 345 kV Station NGRID NaN NaN NaN ... MIS Y NaN RI NaN Y NaN NaN NaN NaN
1546 4 EMI Dighton Power Project None Bristol MA U6 Line NGRID NG NaN NaN ... ES Y NaN SEMA NaN Y NaN NaN NaN NaN
1547 3 Androscoggin Energy Center None Franklin ME Jay 115 kV Substation CMP DFO NG NaN NaN ... ES Y NaN ME NaN Y NaN NaN NaN NaN
1548 2 EMI-Tiverton None Newport RI Near Tiverton 115 kV Substation NGRID NG NaN NaN ... ES Y NaN SEMA NaN Y NaN NaN NaN NaN
1549 1 Millennium+K117 None Worcester MA W 123 Line NGRID DFO NG NaN NaN ... ES Y NaN WMA NaN Y NaN NaN NaN NaN

1550 rows × 31 columns

PJM#

pjm = gridstatus.PJM()
pjm.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Interim/Interconnection Service Agreement Status Wholesale Market Participation Agreement Construction Service Agreement Construction Service Agreement Status Upgrade Construction Service Agreement Upgrade Construction Service Agreement Status Backfeed Date Long-Term Firm Service Start Date Long-Term Firm Service End Date Test Energy Date
0 A01 South Lebanon 230 KV None Lebanon PA None ME Natural Gas 673.0 673.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
1 A02 Oak Hall 138 kV (Oil CT) None Unknown VA None DPL Oil 311.8 315.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
2 A03 Linden 230 kV or 138 kV None Union NJ None PSEG Natural Gas 114.0 120.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
3 A04 Linden 230 kV or 138 kV None Union NJ None PPL Natural Gas 750.0 750.0 ... Document Posted NaN NaN Not Required NaN NaN 6/10/2004 NaN NaN 3/11/2005
4 A05 Bergen None Bergen NJ None PSEG Natural Gas 500.0 500.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
9121 903384 PJM-WEC None NaN NaN None NaN NaN 320.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 5/15/2010 5/31/2011 NaN
9122 988887 PJM-CIN None NaN NaN None NaN NaN 20.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 6/1/2009 6/1/2014 NaN
9123 994856 PJM-TVA None NaN NaN None NaN NaN 138.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 2/1/2009 2/1/2014 NaN
9124 994857 PJM-TVA None NaN NaN None NaN NaN 90.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 2/1/2009 2/1/2014 NaN
9125 994858 PJM-TVA None NaN NaN None NaN NaN 90.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 2/1/2009 2/1/2014 NaN

9126 rows × 37 columns