Interconnection Queues#

All ISOs support retrieving interconnection queues with iso.get_interconnection_queue methods.

Each of the ISOs report slightly differently fields for their queues, so a best effort was made to standardize column names. When a column couldn’t be standardized, it is appended to end of the returned dataframe.

Below you can see preview of each of ISOs interconnection queues

NYISO#

import gridstatus
nyiso = gridstatus.NYISO()
nyiso.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Withdrawn Date Withdrawal Comment Actual Completion Date Proposed In-Service Proposed Initial-Sync Date Last Updated Date Z S Availability of Studies SGIA Tender Date
0 0276 Homer Solar Energy Center NaN Cortland NY NaN NM-NG Solar 90.0 90.0 ... NaN NaN NaN NaT 2023-09-01 9/30/2022 C 10.0 FES, SRIS, FS NaN
1 0393 Berrians East Replacement NaN Queens NY NaN CONED Dual Fuel 94.2 94.2 ... NaN NaN NaN NaT 2024-08-01 6/30/2022 J 11.0 FES, SRIS, FS NaN
2 0396 Baron Winds NaN Steuben NY NaN NYSEG Wind 238.4 238.4 ... NaN NaN NaN NaT 2022-11-29 12/31/2022 C 13.0 FES, SRIS, FS NaN
3 0396A Wood Street Transformer NaN Putnam NY NaN NYSEG AC Transmission 0.0 NaN ... NaN NaN NaN NaT NaT 4/30/2021 G 12.0 SIS NaN
4 0422 Eight Point Wind Energy Center NaN Steuben-Allegany NY NaN NYSEG Wind 101.8 101.8 ... NaN NaN NaN NaT 2022-11-01 3/31/2021 C 12.0 FES, SRIS, FS NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1464 583 Fulton NaN Oswego NY NaN NM-NG Hydro 1.3 1.3 ... NaN NaN 3/31/18 NaT NaT 3/31/18 C 14 FS 2017-07-12 00:00:00
1465 0696 Swinging Bridge Unit 3 NaN Orange NY NaN O&R Hydro 1.2 1.2 ... NaN NaN 2020-04-30 00:00:00 NaT NaT 2020-04-30 00:00:00 G 14 NaN 2018-06-20 00:00:00
1466 0701 KCE NY 1 NaN Saratoga NY NaN NYSEG Energy Storage 20.0 20.0 ... NaN NaN 2020-04-30 00:00:00 NaT NaT 2020-04-30 00:00:00 F 14 NaN 2018-06-20 00:00:00
1467 0731 Branscomb Solar NaN Washington NY NaN NM-NG Solar 20.0 20.0 ... NaN NaN 2022-03-31 00:00:00 NaT NaT 2022-03-31 00:00:00 F 14 FES, SIS, FS 2020-04-29 00:00:00
1468 0781 Marcy South SSR Detection NaN Delaware NY NaN NYPA AC Transmission 0.0 NaN ... NaN NaN 2020-04-30 00:00:00 NaT NaT 2020-04-30 00:00:00 E 14 SIS NaN

1469 rows × 24 columns

CAISO#

caiso = gridstatus.CAISO()
caiso.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Interconnection Request Receive Date Interconnection Agreement Status Study Process Proposed On-line Date (as filed with IR) System Impact Study or Phase I Cluster Study Facilities Study (FAS) or Phase II Cluster Study Optional Study (OS) Full Capacity, Partial or Energy Only (FC/P/EO) Off-Peak Deliverability and Economic Only Feasibility Study or Supplemental Review
0 22 MONTEZUMA (HIGH WINDS III) None SOLANO CA Birds Landing Sub 230 kV Bus PGAE Wind Turbine + Storage 38.0 None ... 2003-11-18 00:00:00 Executed AMEND 39 2005-06-30 07:00:00 Complete Complete NaN NaN Off-Peak Deliverability NaN
1 32 TULE WIND None SAN DIEGO CA Boulevard East Substation 138 kV SDGE Wind Turbine 193.8 None ... 2004-05-12 00:00:00 Executed Serial LGIP 2007-09-01 07:00:00 Complete Complete None Partial Capacity Off-Peak Deliverability Waived
2 72 LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT None RIVERSIDE CA Proposed Lee Lake Substation 500 kV SDGE Storage 500.0 None ... 2005-04-26 00:00:00 Executed Serial LGIP 2008-12-31 08:00:00 Complete Re-Study None Full Capacity NaN Waived
3 138 SANDSTORM WIND POWER None RIVERSIDE CA Devers - San Bernardino 230 kV line SCE Wind Turbine + Storage 150.0 None ... 2006-10-23 00:00:00 Executed Serial LGIP 2008-12-31 08:00:00 Complete Complete None Partial Capacity Off-Peak Deliverability Waived
4 146 DESERT SUNLIGHT PV I None RIVERSIDE CA Red Bluff Substation 230kV SCE Photovoltaic + Storage 250.0 None ... 2006-11-16 00:00:00 Executed Serial LGIP 2008-12-01 08:00:00 Complete Complete None Partial Capacity Off-Peak Deliverability Required
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
2270 2189 LA FUENTE ENERGY STORAGE None SAN DIEGO CA Otay Mesa Switchyard 230 kV SDGE Storage 100.0 None ... 2021-04-14 00:00:00 NaN C14 2024-06-01 07:00:00 NaN NaN NaN Full Capacity NaN NaN
2271 2190 HERMES ENERGY STORAGE None SAN DIEGO CA Border Substation 69 kV SDGE Storage 150.0 None ... 2021-04-15 00:00:00 NaN C14 2024-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN
2272 2191 FREIGHT ENERGY STORAGE None SAN DIEGO CA Border Substation 69 kV SDGE Storage 50.0 None ... 2021-04-15 00:00:00 NaN C14 2025-06-01 07:00:00 NaN NaN NaN Full Capacity NaN NaN
2273 2193 VENTANA ENERGY STORAGE None SAN BERNARDINO CA Lugo SCE Storage 250.0 None ... 2021-11-19 00:00:00 NaN ISP 2024-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN
2274 2194 PRONGHORN ENERGY STORAGE None LOS ANGELES CA Antelope SCE Storage 120.0 None ... 2022-05-07 00:00:00 NaN ISP 2026-06-01 07:00:00 NaN NaN NaN Full Capacity Off-Peak Deliverability NaN

2275 rows × 36 columns

SPP#

spp = gridstatus.SPP()
spp.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Withdrawn Date Withdrawal Comment Actual Completion Date In-Service Date Commercial Operation Date Cessation Date Current Cluster Cluster Group Replacement Generator Commercial Op Date Service Type
0 GEN-2023-SR7 None None NaN NaN Hoskins 345 kV Substation NaN Battery/Storage 100.80 100.80 ... None None None NaN NaN NaN Surplus NaN NaN ER
1 GEN-2023-SR6 None None NaN NaN Hoskins 345 kV Substation NaN Solar 100.24 100.24 ... None None None NaN NaN NaN Surplus NaN NaN ER
2 GEN-2023-SR5 None None Seiling OK Tatonga 345 kV Substation NaN Battery/Storage 85.00 85.00 ... None None None NaN 12/31/2022 NaN Surplus NaN NaN ER
3 GEN-2023-SR4 None None Burke ND Tande 345 kV Substation BEPC Battery/Storage 104.40 104.40 ... None None None 11/30/2022 NaN NaN Surplus NaN NaN ER
4 GEN-2023-SR3 None None Blackwell OK Nardin 69 kV Substation NaN Battery/Storage 50.00 50.00 ... None None None NaN 12/31/2022 NaN Surplus NaN NaN ER
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
800 GEN-2001-029N None None Beatrice NE NaN NPPD Thermal - Gas 250.00 250.00 ... None None None 1/1/2005 1/1/2005 NaN NaN NaN NaN ER
801 GEN-2001-026 None None Meers OK Washita 138kV WFEC Wind 74.25 74.25 ... None None None 10/1/2003 10/1/2003 NaN ICS-2008-001 Prior Queued 04 SOUTHEAST NaN ER
802 GEN-2001-024 None None Washington County AR SWEPCO Tontitown 161kV Substation AEP Thermal - CT 630.00 580.00 ... None None None 5/1/2007 7/1/2007 NaN NaN NaN NaN ER
803 GEN-2001-018 None None Neosho County KS Chanute NW Neosho Cnty By Tioga Sub WERE Thermal - Gas 47.00 47.00 ... None None None 1/1/2002 1/1/2002 NaN NaN NaN NaN ER
804 GEN-2001-014 None None Sleeping Bear OK Ft Supply 138kV WFEC Wind 94.50 94.50 ... None None None 6/30/2007 4/15/2007 NaN ICS-2008-001 Prior Queued 04 SOUTHEAST NaN ER

805 rows × 24 columns

Ercot#

ercot = gridstatus.Ercot()
ercot.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... IA Signed Air Permit GHG Permit Water Availability Meets Planning Meets All Planning CDR Reporting Zone Approved for Energization Approved for Synchronization Comment
0 14INR0033 Goodnight Wind FGE Goodnight I, LLC Armstrong Texas tap 345kV 79500 Alibates - 79503 Tule Canyon CKT2 None Wind - Wind Turbine 531.00 None ... 2019-08-18 Not Required Not Required Not Required NaN NaN PANHANDLE NaT NaT NaN
1 15INR0059 Emerald Grove Solar Emerald Grove Solar, LLC Pecos Texas 76602 Horse Crossing 138kV None Solar - Photovoltaic Solar 108.00 None ... 2017-12-04 Not Required Not Required Not Required 1900-01-01 00:00:00 2019-04-17 00:00:00 WEST 2021-12-10 2022-01-04 NaN
2 15INR0064b Harald (BearKat Wind B) CIP Glasscock Texas 59903 Bearkat 345kV None Wind - Wind Turbine 162.10 None ... 2018-05-30 Not Required Not Required Not Required 2018-05-30 00:00:00 2018-09-19 00:00:00 WEST 2020-02-10 2020-05-12 NaN
3 16INR0049 Nazareth Solar TX Nazareth Solar, LLC Castro Texas tap 345kV 23914 Tule Canyon - 23912 Ogallala C2 None Solar - Photovoltaic Solar 204.00 None ... 2018-05-10 Not Required Not Required Not Required NaN NaN PANHANDLE NaT NaT NaN
4 16INR0081 Mesteno Wind Mesteno Windpower, LLC Starr Texas 80355 Del Sol 345kV None Wind - Wind Turbine 201.60 None ... 2018-04-25 Not Required Not Required Not Required 2018-04-25 00:00:00 2019-03-28 00:00:00 SOUTH 2019-11-26 2019-12-12 NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1078 27INR0003 Becerra Creek Storage 2 Bordas Renewable Energy, LLC Webb Texas 345 kV Cenizo Substation (#80220) None Other - Energy Storage 125.62 None ... NaT NaN NaN NaN NaN NaN SOUTH NaT NaT NaN
1079 27INR0004 Dundee North Wind Felix 2, LLC Wilbarger Texas 345 kV Riley Substation (#6101); AEP None Wind - Wind Turbine 307.72 None ... NaT NaN NaN Not Required NaN NaN WEST NaT NaT NaN
1080 27INR0005 Dundee South A Wind Felix 2, LLC Baylor Texas 345 kV Riley Substation (#6101); AEP None Wind - Wind Turbine 307.23 None ... NaT NaN NaN Not Required NaN NaN WEST NaT NaT NaN
1081 27INR0007 Felix East Solar Felix 1, LLC Wilbarger Texas The 345 kV Riley Substation (#6101); AEP None Solar - Photovoltaic Solar 301.44 None ... NaT NaN NaN Not Required NaN NaN WEST NaT NaT NaN
1082 27INR0009 Felix Storage Felix 1, LLC Wilbarger Texas The 345 kV Riley Substation (#6101); AEP None Other - Battery Energy Storage 100.54 None ... NaT NaN NaN Not Required NaN NaN WEST NaT NaT NaN

1083 rows × 35 columns

MISO#

miso = gridstatus.MISO()
miso.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... giaToExec studyCycle studyGroup studyPhase svcType dp1ErisMw dp1NrisMw dp2ErisMw dp2NrisMw sisPhase1
0 E002 None None Pointe Coupee LA 500 kV switchyard at Big Cajon II Entergy Gas 15.0 15.0 ... 2013-12-16T05:00:00Z ERIS 0.0 0.0 0.0 0.0
1 E291 None None TX Rich 138 kV substation Entergy Hydro 27.0 27.0 ... 2013-10-22T04:00:00Z ERIS 0.0 0.0 0.0 0.0
2 G001 None None Brown County WI Unknown American Transmission Co. LLC 255.0 255.0 ... None SPA - SIS ERIS 0.0 0.0 0.0 0.0
3 G002 None None Trimble County KY Unknown LG&E and KU Services Company as agent for Loui... Coal 174.0 174.0 ... None ERIS 0.0 0.0 0.0 0.0
4 G003 None None Trimble County KY Unknown LG&E and KU Services Company as agent for Loui... Coal 174.0 174.0 ... None ERIS 0.0 0.0 0.0 0.0
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
4248 R66 None None Adams County IA Creston - Clarinda 161 kV MidAmerican Energy Company Wind 150.0 150.0 ... None Feasibility NRIS 0.0 0.0 0.0 0.0
4249 R67 None None Clay County IA Sheldon (Obrien county sub) 345 kV MidAmerican Energy Company Wind 148.8 148.8 ... None SPA - SIS NRIS 0.0 0.0 0.0 0.0
4250 R68 None None Hancock County IA MEC Webster 345 kV Substation MidAmerican Energy Company Wind 249.6 249.6 ... None SPA - SIS NRIS 0.0 0.0 0.0 0.0
4251 Temp3257 None None Unknown Ewington Energy Systems, LLC 0.0 0.0 ... None 0.0 0.0 0.0 0.0
4252 Test 1234 None None Jackson County TX test line 1 - test line 2 138 kV Ewington Energy Systems, LLC 0.0 0.0 ... None 125 sss MTEP 0.0 0.0 0.0 0.0

4253 rows × 31 columns

ISONE#

isone = gridstatus.ISONE()
isone.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... SIS Complete I39 Dev Zone FS SIS OS FAC IA Project Status
0 1 Millennium+K117 None Worcester MA W 123 Line NGRID DFO NG NaN NaN ... True True NaN WMA NaN NaN NaN NaN NaN NaN
1 2 EMI-Tiverton None Newport RI Near Tiverton 115 kV Substation NGRID NG NaN NaN ... True True NaN SEMA NaN NaN NaN NaN NaN NaN
2 3 Androscoggin Energy Center None Franklin ME Jay 115 kV Substation CMP DFO NG NaN NaN ... True True NaN ME NaN NaN NaN NaN NaN NaN
3 4 EMI Dighton Power Project None Bristol MA U6 Line NGRID NG NaN NaN ... True True NaN SEMA NaN NaN NaN NaN NaN NaN
4 5 Brayton Pt None Bristol MA Brayton Point 345 kV Station NGRID NaN NaN NaN ... True True NaN RI NaN NaN NaN NaN NaN NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
1296 1308 Uxbridge Substation – NG Hopedale West Group S... None Worcester MA NG Feeder 321W6, Uxbridge T2 NaN BAT 6.994000 6.994000 ... False False PD SEMA NaN NaN NaN NaN NaN NaN
1297 1310 Battery Storage None Berkshire MA 115 kV Transmission line (1211 - Present betwe... NaN BAT 118.750000 118.750000 ... False False PD WMA In Progress NaN NaN NaN NaN Under Study
1298 1314 Offshore Wind None NaN MA Eversource 115kV Acushnet, lines 112/114 NaN WND 470.000000 470.000000 ... False False PD SEMA NaN Not Started NaN NaN NaN Under Study
1299 1315 Battery Storage None Windham CT Eversource Killingly Substation,115kV BUS, Tra... NaN BAT 106.970001 106.970001 ... False False PD CT In Progress NaN NaN NaN NaN Under Study
1300 1316 Solar plus Battery None Cheshire NH Eversource 115kV line L163 NaN SUN BAT 102.000000 102.000000 ... False False NaN NH In Progress NaN NaN NaN NaN Under Study

1301 rows × 32 columns

PJM#

pjm = gridstatus.PJM()
pjm.get_interconnection_queue()
Queue ID Project Name Interconnecting Entity County State Interconnection Location Transmission Owner Generation Type Capacity (MW) Summer Capacity (MW) ... Interim/Interconnection Service Agreement Status Wholesale Market Participation Agreement Construction Service Agreement Construction Service Agreement Status Upgrade Construction Service Agreement Upgrade Construction Service Agreement Status Backfeed Date Long-Term Firm Service Start Date Long-Term Firm Service End Date Test Energy Date
0 A01 South Lebanon 230 KV None Lebanon PA None ME Natural Gas 673.0 673.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
1 A02 Oak Hall 138 kV (Oil CT) None Unknown VA None DPL Oil 311.8 315.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
2 A03 Linden 230 kV or 138 kV None Union NJ None PSEG Natural Gas 114.0 120.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
3 A04 Linden 230 kV or 138 kV None Union NJ None Unknown Natural Gas 750.0 750.0 ... Document Posted NaN NaN Not Required NaN NaN 6/10/2004 NaN NaN 3/11/2005
4 A05 Bergen None Bergen NJ None PSEG Natural Gas 500.0 500.0 ... Document Posted NaN NaN Not Required NaN NaN NaN NaN NaN NaN
... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
8688 903384 PJM-WEC None NaN NaN None NaN NaN 320.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 5/15/2010 5/31/2011 NaN
8689 988887 PJM-CIN None NaN NaN None NaN NaN 20.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 6/1/2009 6/1/2014 NaN
8690 994856 PJM-TVA None NaN NaN None NaN NaN 138.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 2/1/2009 2/1/2014 NaN
8691 994857 PJM-TVA None NaN NaN None NaN NaN 90.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 2/1/2009 2/1/2014 NaN
8692 994858 PJM-TVA None NaN NaN None NaN NaN 90.0 NaN ... NaN NaN NaN NaN NaN NaN NaN 2/1/2009 2/1/2014 NaN

8693 rows × 37 columns